Skip to main content
IT KORR
IT KORRKeeping Organizations Reliable & Resilient

Business Continuity & Disaster Recovery · Resource

Disaster Recovery Runbook Template

A step-by-step disaster recovery runbook structure for recovering a specific system, from pre-recovery checks through verification and rollback.

IT KORR Knowledge Center

Disaster Recovery Runbook Template

A step-by-step disaster recovery runbook structure for recovering a specific system, from pre-recovery checks through verification and rollback.

System Overview & Dependencies

  • System name, owner, and business function(s) it supports.
  • Hosting location and environment (on-prem, cloud provider/region, SaaS).
  • Upstream and downstream dependencies (e.g., requires database and DNS to be available first; downstream systems that depend on this one).
  • Defined RPO and RTO for this specific system.

Pre-Recovery Checklist

  • Confirm the scope and cause of the outage before beginning recovery, where known.
  • Confirm dependency systems (network, DNS, authentication, database) are available or being recovered in parallel.
  • Confirm access to required credentials, consoles, and the most recent known-good backup or snapshot.
  • Notify the IT Recovery Lead that recovery of this system is starting.

Step-by-Step Recovery Procedure

  • Step 1 — Identify the most recent valid backup or snapshot and confirm its timestamp against the RPO.
  • Step 2 — Provision or confirm availability of target infrastructure (server, instance, or container) to restore onto.
  • Step 3 — Restore data/configuration from the identified backup to the target infrastructure.
  • Step 4 — Restart or bring the application/service online on the restored infrastructure.
  • Step 5 — Redirect traffic/DNS/load balancer configuration to the recovered system if it is running on new infrastructure.
  • Step 6 — Confirm the system is reachable on its expected endpoint before proceeding to verification.

Verification Steps

  • Confirm the application starts without error and core functionality responds as expected.
  • Run a defined smoke test (e.g., login, key transaction, data read/write) to confirm functional recovery, not just uptime.
  • Compare restored data against the expected recovery point to confirm data integrity.
  • Confirm downstream/dependent systems can successfully connect to the recovered system.

Rollback Procedure

  • Define the condition that triggers a rollback (e.g., verification fails, data corruption detected, unacceptable performance).
  • Preserve the failed recovery attempt's state/logs before rolling back, to support root-cause analysis.
  • Revert traffic/DNS/load balancer configuration back to the prior known-good state, if applicable.
  • Escalate to the IT Recovery Lead immediately if rollback is required — do not silently retry indefinitely.

Contact & Escalation List

  • System owner — primary and backup contact.
  • IT Recovery Lead — primary and backup contact.
  • Relevant vendor/support contact for the system or hosting provider, including support tier/contract reference.
  • Escalation path and maximum wait time before moving to the next contact.

Related Resources

  • Disaster Recovery Planning — /knowledge-center/business-continuity/business-continuity-disaster-recovery/disaster-recovery-planning
  • High Availability vs. Disaster Recovery — /knowledge-center/business-continuity/business-continuity-disaster-recovery/high-availability-vs-disaster-recovery

This document is a starting-point resource, not legal or compliance advice. Review it against your organization's actual systems before adoption — see the full Business Continuity & Disaster Recovery Hub for the reasoning behind each recommendation, or browse the full Resource Library.

If you would rather not do this by hand

Testing whether this plan would actually work is a defined engagement.

A written plan and a tested one are different things. Discovery is read-only; restoring anything is a separate step you scope and authorise first.

Or describe what you are trying to protect — the enquiry form opens with “Backup & Recovery” selected, and you can change it.

Business Continuity & Disaster Recovery

Need This Plan Tested Against Your Real Environment?

A documented plan is the starting point — IT KORR can validate backup coverage, run the recovery tests that prove your RTOs are achievable, and maintain the continuity documentation behind them.

No commitment required — a person reads every enquiry and replies directly, or call (848) 200-9669 now.